You got to hand it to Sarawak Deputy Chief Minister Alfred Jabu. He doesn’t know the facts – his own admission – but he still thinks the Bakun losses could have been averted.
Reports have said that cost over-runs of RM1.7 billion have been incurred by Sime Darby on a contract worth RM1.8 billion for the dam. Now not only is the Bakun Dam jinxed, a hex has been placed on Sime Darby too after it touched the project.


