Jul 162010
 

For what is expected to be the biggest mega project of them all, the RM43 billion Mass Rapid Transit proposal has received little prominent media publicity and most Malaysians remain in the dark about it. The ‘unsolicited proposal’ for a 180-200km partly underground railway network in Kuala Lumpur by Gamuda Bhd and MMC Corp is now undergoing feasibility studies by two government-appointed consultants, according to a report in The Star. The actual project is expected to cost RM36 billion. Add land acquisition and rolling stock cost and the tab reportedly could come up to a jaw-dropping RM43 billion. (What about possible cost overruns?) That makes it the largest construction job under the Tenth Malaysia Plan.

Mar 072010
 

Back from a rejuvenating day at Penang Forum 2, where 170 concerned individuals, including representatives from 35 Penang-based NGOs, grappled with the question, ‘Has anything changed after two years?’ The participants passed two resolutions: they supported the Penang state government’s call for the reinstatement of local government elections and called on the Election Commission to act, pronto. In the interim period, they called for the quota for reps of public interest NGOs to be increased to five each in the Penang Municipal Council and the Seberang Perai Municipa Council. The second resolution called for the Local Plan for Penang Island (completed/revised in 2009) to be made public so the public can give their views. Never mind if it is a bit dated by now. (The plan covers the period from 2005 to 2020.) During the forum, participants were fascinated to learn the following:

Feb 222010
 

Spotted this letter in theSun today about the second Penang bridge (now in the preliminary stages of construction). It mirrors my thoughts exactly. Penang’s roads are already congested during peak hours, Friday and Saturday evenings, and festive periods – and that is with three lanes of traffic along the newly widened Penang Bridge pouring into the island. What happens when the second bridge creates two or three additional lanes of vehicles flowing into the island? No need for second link I AM a resident of Penang Island and a regular user of the Penang Bridge. Every day the traffic report on the radio nearly always has the same good news for users of the bridge like me: “Clear on both lanes and at the entry and exit points both on the mainland and on the island.”

Jan 272010
 
Speakers' corner for Penang?

Penang may soon set up the country’s first public speakers’ corner. (I use the term ‘public’ because a speakers’ corner at the Perdanasiswa Complex in Universiti Malaya has just been re-opened after about 40 years.) The Penang state government said yesterday that it was thinking of a permanent stage at the Esplanade for candlelight vigils, open forums and demonstrations. It would be at a distance from traffic, said a report in today’s Sun. “The stage can be used on request by anybody, provided it has not been reserved for other events,” said exco member Chow Kon Yeow, who added that a committee may be set up to liaise with NGOs in this matter. Now this is a positive development, especially if the state government folks are going to discuss the exact location with civil society and the public – but why do we need a stage?  In London, the Speakers’ [Read more]

Jan 212010
 

From what I hear, a Penang transport masterplan is in the pipeline, with the state government believed to be working now on the terms of reference. Once the TOR are finalised, an open tender is likely be held, perhaps in the second quarter of 2010, for the actual work of formulating the masterplan, which could take about a year to complete. The emphasis of the plan is likely to be on sustainable transport. I hope the masterplan will try and wean people away from private vehicle ownership and encourage them to switch to public transport. In line with this, the focus of new infrastructure spending should be on public transport and pedestrian networks (and perhaps even cycling facilities) rather than new highways. The masterplan should also try and maximise the potential of water-based transport in the state.